CSIRO Building 73/301

CSIRO
 
Screen Shot 2018-07-10 at 9.53.11 PM.png


PSGH were engaged as Construction Manager for the refurbishment of buildings 73 and 301 at the Black Mountain Laboratories Campus, ACT. PSGH are responsible for the completion of the design (nominally 30%) and to construct the fully designed project. The project is scheduled for completion in July 2018.

As part of the upgrade PSGH are responsible for demolishing and reconstructing laboratory facilities and o ce spaces within the existing buildings. In addition, there are major re and life safety upgrades to the buildings, as well as an increase to electrical infrastructure systems and mechanical plant infrastructure.